Well construction project at Kakraba
Kakraba
Infrastructure
Fetteh Kakraba

Well construction project at Kakraba

RurATechPromotion gGmbH and its local partner, Wirenkyiren Amanfrom People Project Ltd, built the first well in the town to help solve the problem of drinking water. The construction of four more wells as well as the purchase of a water tanker is planned.

Excavation of the well

Excavation of the well

A short break

A short break

The well shaft is installed

The well shaft is installed

Preparing for the lid

Preparing for the lid

The lid is cast in concrete

The lid is cast in concrete

The edge of the well must dry out

The edge of the well must dry out

The well is ready for use

The well is ready for use

All projects